Ofosu South
400 kW mini-grid • 300+ pole works • 2,000+ household assessment and connection workflows.
Technical site leadership for two solar hybrid mini-grid projects in Ofosu, Ondo State, covering generation infrastructure, battery storage integration, LV/HV distribution networks, transformer installation, customer connections and commissioning activities.
Engineering Scope
Lead generation-site construction activities including site marking, fencing layout, PV plinth marking, civil work monitoring and PV structure installation.
Supervise installation of 1,052 PV modules at Ofosu South and 1,100+ PV modules at Ofosu North including PV mounting, string configuration and DC cable installation.
Coordinate installation of eight 50 kW PV inverters, PVDBs, LVSG, SCADA panels, communication systems and monitoring infrastructure.
Supervise installation and integration of Firmar PCS and 1 MWh BESS systems with energy management and communication systems.
Coordinate installation of 500 kVA isolation transformer, 500 kVA step-down transformer, 550 kVA diesel generator and associated protection accessories.
Supervise HV and LV distribution network construction including pole erection, conductor stringing, stays, transformer installation, RMU installation and earthing works.
Coordinate installation of AC cables, DC cables, armoured cables, communication cables and cable management systems.
Monitor electrical testing including insulation resistance, continuity, polarity, earth resistance and commissioning preparation checks.
Oversee customer assessment, dropline measurement, smart metering, household wiring supervision and customer connection activities.
Coordinate contractor activities, quality inspections, technical reporting and as-built documentation.
Delivery Outcomes
Delivered generation and distribution infrastructure for two solar hybrid mini-grid projects with a combined capacity of 850 kW.
Supported reliable electricity access for over 3,500 households, businesses and productive users across Ofosu South and Ofosu North.
Coordinated installation of PV systems, BESS, inverters, transformers, distribution networks and customer connection activities.
Supported testing, commissioning readiness, technical reporting and as-built documentation for project handover.
Sites / Work Packages
Individual sites or work packages delivered under the wider project assignment.
400 kW mini-grid • 300+ pole works • 2,000+ household assessment and connection workflows.
450 kW mini-grid • 340+ pole works • 1,500+ household assessment and connection workflows.
Technical Areas
18 items
Engineering Portfolio
View additional renewable-energy, mini-grid, distribution-network and project-delivery assignments.